7 Sept 2021

Npower: How To Fix BVN Printout Issue As An Npower Physical Verification Document

Please if you are an N-Power Batch C applicant and you are confused whether to take your BVN print out to the physical verification center or not, please this is not an issue.


Although your BVN number is unique to you, taking it along with you to the Npower physical verification center is not a crime at all, remember that your BVN was inputted into the N-Power NASIMS portal and is visible on the Portal.


Yes, one will say for security reasons the BVN should not be displayed publicly, please if you are an N-Power Batch C applicant and you are doubtful, then please do not take your BVN print out to the Npower physical verification center.


The BVN printout is not a requirement at this stage, although for reference purposes an N-Power Batch C applicant could have it at his or her possession.


The BVN print out is a document for rectifying issues that has to do with payment, payment challenges, delay in payment,etc, we hope no Npower Batch C applicant will encounter such issues.


Please the BVN printout is not mandatory, it is just for reference purposes and might be taken along or might not be taken along to the Npower physical verification center.

Npower: You Got An Email To Download PPA Letter, But Not Deployed On NASIMS, Please Read This

Please if you are an N-Power Batch C applicant and you got an email to download your Npower PPA letter but on checking your Npower NASIMS portal you saw the message "not deployed yet".


Please if you are having this issue, just use the Npower USSD code to check your N-Power physical verification center, that is the most important thing right now, the Npower USSD code can also be used to check your N-Power deployment status just follow the instructions on the USSD prompt.


All N-Power Batch C applicants have been advised that N-Power physical verification comes first before deployment, right now the most important thing is knowing and locating your Npower physical verification center, it is after an N-Power Batch C applicant is successful from the Npower physical verification before he or she starts talking about deployment.


So the process is N-Power physical verification first which will commence on Friday before deployment, note if an N-Power Batch C applicants fails the N-Power physical verification exercise then he or she will not be deployed even if the N-Power Batch C applicant was initially deployed on the N-Power NASIMS portal.


Npower: Having Issues Trying To login, Please Read This

If you are an N-Power Batch C applicant and currently you are having issues login into the Npower NASIMS portal, please suspend using the Npower NASIMS portal for now and use the Npower USSD Code.


The USSD code *45665# is faster and more efficient in giving an N-Power Batch C applicant quick Information about his or her deployment status.


The most important and critical thing right now is checking your Npower physical verification center, Npower physical verification starts on Friday and this is the most important exercise.


Even if you are able to download the PPA letter, and you did not participate in the N-Power physical verification exercise your PPA letter is invalid.


The Npower NASIMS physical verification exercise is extremely important, without completing your N-Power physical verification exercise you will not be paid, even if your PPA letter has been signed and uploaded to the Npower NASIMS portal.


All N-Power Batch C applicants have been advised to suspend downloading the PPA letter for now and focus on their Npower physical verification exercise which will commence on Friday 10th September.

Npower: Npower Physical Verification Will Hold On The 10th, See Requirements

Lots of Npower Batch C applicants have been asking if the N-Power physical verification will commence on the 10th of September, yes the N-Power physical verification will commence on the 10th of September.


N-Power physical verification will commence before deployment, please all N-Power Batch C applicants are to either use the USSD code *45665# or check their Npower NASIMS portal directly for their Npower physical verification center address.


Downloading of the N-Power PPA deployment letter has been temporarily switched off because the Npower deployment process was supposed to be Npower physical verification first before deployment, so please all N-Power Batch C applicants are to leave downloading their PPA letter and make ready their documents for Npower physical verification.


The requirements for the N-Power Batch C physical verification are:


1) Your physical presence

2) An N-Power Batch C applicants credentials uploaded on the N-Power NASIMS portal; WAEC, NECO,BSC, OND,HND,NCE etc

3) National ID

4) NASIMS profile page

5) Congratulations Message from email

6) BVN print out although this might not be required

7) Birth certificate/Age Declaration

8) Change of name evidence for married couple

9) Other documents as specified in the image attached

All photocopies and original, please note, PPA letter is not required, but if you have it, you can just take it along.

Featured post

Greenpeg Graduate Trainee Program

About Greenpeg Nigeria Limited  Greenpeg Nigeria Limited offers engineering, procurement, construction, installation, operations and mainten...